

EREMOR FLOWSTATION (NIGERIA)
The Eremor field is a marginal oil and gas field situated in the swamp area of Bayelsa State, Nigeria. The Eremor field development involves the installation of a 10,000 bopd flowstation to separate oil, gas and water in a one-stage separation process and deliver pipeline quality crude. The oil is heavy with a low gas-oil-ratio. The flowstation will be installed on a steel barge. Storage capacity for two days will be provided in the barge hull. Stabilized crude will be exported through a 2.5 km long export pipeline to Brass Creek manifold. The pipeline and the flowstation are
currently in the procurement stage and will be commissioned in Q3 2009.

SCOPE OF WORK
• Conceptual, basic and detail design![]()
• Project management![]()
• Procurement assistance![]()
• Supervision of factory acceptance tests![]()
• Interface management![]()
• Site supervision![]()
• Commissioning assistance![]()